Conveners
ITER System
- Franco Gandini (ITER Organization)
ITER System
- Victor Udintsev (ITER Organization)
The installation of the ITER Gyrotrons on the ITER site will start this summer and the tests are scheduled for next year. To transmit Electron Cyclotron (EC) beam minimising the losses, qualified test and precise alignment are required in the installation of both Gyrotrons and Transmission Lines (TL). Mode purity and suppression of Higher Order Modes (HOMs) are necessary to comply with the...
The ITER electron cyclotron emission diagnostic design [1] is progressing and will soon transition into development. The measurement and analysis of the electron cyclotron emission (ECE) is one of the primary diagnostics for measuring the electron temperature (Te) and electron temperature fluctuations (𝜹Te) on ITER. Here we describe the current design of that diagnostic. ITER will operate at...
The Electron Cyclotron Emission (ECE) diagnostic has a primary role in the measurement of electron temperature profile and electron temperature fluctuations in ITER. This diagnostic shall be exposed to significant power due to unabsorbed Electron Cyclotron Heating (ECH) power in the plasma [1]. The expected stray power loads could be a few watts, and therefore, the protection of millimetre...